Standar Harga (SSH - SBU) Kabupaten Demak 2025

PERBUP NO 21 TAHUN 2025

Kode Rekening Kelompok Barang Uraian Barang Spesifikasi Satuan Harga Satuan
Peralatan Komputer Lainnya UPS Server (6000va) - Max Configurable Power (Watts) : 6000 Watts / 6000VA - Output Frequency (sync to mains) : 50/60 Hz +/- 3 Hz Sync to mains (AC Mode) - Output Connections : Terminal block (1phase) - Output Voltage Distortion : 1% - Nominal Output Voltage : 230V - Other Programmable Voltage : 220V, 240V - Transfer Time : 0ms - Topology : Double conversion online - Waveform type : Sine wave - Input frequency : 40 - 70 Hz - Input voltage range for main operations : 110 – 300 V at Half load, 176 – 300 V at full load - Input Connection : Terminal block (1phase) - Typical recharge time : 9hour(s) - Battery type : Sealed maintenance free (SMF) 12 V, 9 Ah - Battery Bank Voltage : 240 V - Control panel : Multifunction LCD status and control console - Interface Port(s) : DB-9 RS-232, Smart-Slot, USB - Physical Maximum (Height x Width x Depth) : 220 mm x 438 mm x 615 mm - Physical Shipping (Height x Width x Depth) : 490 mm x 600 mm x 870 mm - Physical Net Weight : 78.0KG - Physical Shipping Weight : 88.0KG - Operating Temperature : 0 - 40 °C - Audible noise at 1 meter from surface of unit : 55.0dBA - Approvals : CE, EAC, EN/IEC 62040-1, EN/IEC 62040-2, TISI Unit 76.000.000
Peralatan Komputer Lainnya Nas (Network Attached Storage) 4 BAY, Kapasitas 8TB Unit 25.000.000
5.2.02.10.002.00005 Peralatan Komputer Lainnya WIRELESS HDMI 1TRANSMITTER KOMPATIBEL 4 RECEIVER Unit 2.500.000
5.2.02.15.001.00003 Alat Deteksi Lainnya Early warning system Banjir 1.early warning system Banjir = 60.000.000 , 2.cctv pemantau berjaringan = 15.000.000 Paket 75.000.000
5.2.02.15.001.00003 Alat Deteksi Lainnya Early warning system Banjir 1.early warning system Banjir = 60.000.000 , 2.cctv pemantau berjaringan = 15.000.000 Paket 75.000.000
Alat Deteksi Lainnya Early warning system Banjir 1.early warning system Banjir = 60.000.000 , 2.cctv pemantau berjaringan = 15.000.000 Paket 75.000.000
Alat Deteksi Lainnya Early warning system Banjir 1.early warning system Banjir = 60.000.000 , 2.cctv pemantau berjaringan = 15.000.000 Paket 75.000.000
5.2.02.15.001.00003 Alat Deteksi Lainnya Early warning system Banjir 1.early warning system Banjir 2.cctv pemantau berjaringan Paket 75.000.000
5.2.02.15.001.00003 Alat Deteksi Lainnya CCTV Early warning system Banjir 1.early warning system live streming 2.cctv pemantau debit air berjaringan online Paket 90.000.000
Baju Pengaman Rompi Seragam Lapangan - Buah 180.000
Baju Pengaman Baju Seragam Pelatihan bahan baju lengan pendek, berkancing, bahan union Buah 150.000
Baju Pengaman Rompi Seragam Lapangan - Buah 180.000
Alat Penolong Tali Caramentel Panjang 50 Meter Panjang 50 M Buah 2.000.000
Alat Penolong Carabener SCRU - Buah 550
Alat Penolong Figue eight - Buah 250.000
Alat Penolong BodyHarnes - Buah 1.500.000
Rambu Bersuar Belanja Pengadaan dan Pemasangan CCTV Jalan - Paket 100.000.000
Rambu Bersuar Belanja Pengadaan dan Pemasangan LPJU Ruas Jalan BTS Kota Demak Terguli Sampai BTS Kota Kudus - Paket 750.000.000
Rambu Bersuar Lampu Penerangan Jalan Umum Solar Cell - Unit 41.000.000
Rambu Bersuar Belanja Pengadaan dan Pemasangan LPJU Ruas Jalan Botosiman - Balerejo - Luwuk - Paket 420.000.000
Rambu Bersuar Lampu Penerangan Jalan Umum Konvensional - Unit 19.000.000
Rambu Bersuar Warning Light Solar cell Tiang Siku 2 Aspek Dim .30cm - Unit 40.000.000
Rambu Bersuar Warning Light Solar cell Tiang Lengkung 2 Aspek Dim .30cm - Unit 37.000.000
Rambu Bersuar Belanja Pengadaan dan Pemasangan LPJU Ruas Jalan Pecuk (Mijen-Pasir) - Paket 250.000.000
5.2.02.18.001.00001 Rambu Bersuar Belanja Pengadaan dan Pemasangan Lampu Penerangan Jalan Umum (LPJU) - Paket 420.000.000
Menampilkan 47376 - 47400 dari total 47,748 data